1. Chargeback rate and payment reserve Month 1
Rate ran 1.87% → 2.28% → 12.12% across the last three measured periods, and a 10% rolling Shopify reserve is active. Root cause is the support SOP, which refuses refunds by default and pushes store credit, leaving the card issuer as the customer’s only route. Remedy: rewrite the refund policy in month 1. Reserve release is requested once the rate holds under 1% for 30 consecutive days. This item gates the next one and most of the growth plan.
2. EU device classification Months 1–3
Newly identified in this diligence, and in no earlier document. Micro-needling systems are generally treated as Class IIa medical devices in the EU, and classification turns on needle depth and on the claims made, so it bears on the business as it trades today. EU cosmetic SKUs separately require CPNP notification and an EU Responsible Person. Remedy: obtain the needle specification from the manufacturer and take a formal regulatory opinion before any EU expansion is committed.
3. IP ownership Month 1
The hero product is protected by a Chinese design patent, covering appearance rather than function, expiring Nov 2030 and held by the manufacturer rather than by the brand. It was reassigned to them in late 2025. A functionally equivalent device of different appearance would not infringe it, and no trademark is registered for the brand name anywhere. Remedy: file CH and EU marks in month 1, and seek assignment or licence of the design right in contract talks.
4. No supplier contract Months 1–3
Nothing is signed with either the manufacturer or the fulfilment centre: no exclusivity, no assignment, no termination terms and no contingency. The sole-source position that supports the price rests on a relationship rather than on paper. Remedy: negotiate written terms and qualify a backup supplier over months 1 to 3.
5. Revenue trend and customer acquisition cost Months 1–9
Revenue is 85.5% below its January peak. CAC rose from about $86 to $140 against a $135.44 average order value, so first-order paid acquisition is at or below break-even, and LTV:CAC runs 1.0–1.6× against a 3.0× benchmark. Part of the fall is winter-weighted seasonality visible in every prior year; part of it is not. Remedy: hold spend restrained until the reserve clears, then rebuild on owned channels first. The 18,613-profile list and the subscription programme carry revenue independently of paid.
6. Trustpilot guideline breach From month 1
The profile carries an active warning citing review-management practices, and has been listed under an alias. The 480 on-site reviews are uniformly five-star, are curated, and should not be read as independent evidence of satisfaction. Remedy: reopen under the real brand name, drop the alias and work the platform’s resolution process. This runs on Trustpilot’s calendar rather than the operator’s.
7. Product liability cover Month 1
The device penetrates the skin and ingredient reactions appear in negative reviews. The only current evidence of cover is an informal note from the supplier, with no policy document, no named insurer, no limit and no territory. Remedy: bind a real policy in month 1. Cost is modelled at about $500 a month from month 3.
Months 1–3
Stabilise
Refund policy rewritten, insurance bound, trademarks filed, Trustpilot reopened, supplier contract talks begin. Ad spend held at about 28% of revenue.
Months 3–6
Reserve clears
Chargebacks sustained under 1% for 30 days. Reserve reviewed and released. The largest single cash constraint unlocks.
Months 6–15
Rebuild
Meta scaled back toward historical levels on a clean account, with subscription onboarding and email flows resurrected.
Months 15–24
Track record
Second winter peak and nine to twelve clean months: no reserve, chargebacks under 1%, Trustpilot resolved, contract signed, marks filed.